Alignment Pump and Motor
Pelatihan di Bandung
Description
Motor-Pump alignment is the process of aligning shaft centerlines between a motor and a pump. The motor is the prime mover, transferring power to the pump by the use of a coupling. This is probably the most common configuration of coupled machines in industry.
In this type of alignment, the motor is almost always the moveable machine, and the pump is the stationary machine. In almost all cases, the pump is already piped up with suction and discharge flanges, which means it can move only slightly, if at all.
Motor-pump-alignmentProper shaft alignment is achieved by moving the motor. The motor is shimmed vertically to achieve the proper elevation to align it to the pump, both parallel (offset) and angular. The motor is them moved horizontally to achieve proper horizontal placement for aligning the shaft centerlines, both parallel and angular. The motor is moved horizontally by the use of jacking bolts, or by the use of pry bars, hammers, or other tools.
Motors are normally easier to move, since the motor is not piped into a process system. A short run of flexible conduit is most often used to run the electrical wiring from a local disconnect, or a rigid conduit, to the motor termination box. This allows for ease of movement of the motor.
Materi
1. Fundamental Alignment
2. Diagnosing Misalignment
3. Measuring Misalignment
4. Preparing Task Alignment
5. Alignment Methods (praktis)
•Rough Methods
•Face and Rim
6. Alignment Tolerances
7. Complicating Factor Alignment.
8. Introduction to Laser Alignment
9. Minimizes the forces of misalignment acting upon the bearings and seals of both components.
10. Minimizes Wear of The Coupling.
11. Reduce Energy Costs.
12. Maximizes the life of the Machine Components by Minimizing Wear, ncreasing time between failures, and reducing vibration.
Method
•Presentation
•Discussion
•Simulation
•Case Study
•Evaluation
Who Should Attend
Instrument Engineer/Supervisor, Plant Maintenance/Operators/Supervisors
Instructor
Mokhamad Munir Fahmi, Ir, MT. And Tim
(CV Terlampir)
Time & Venue
TANGGAL : 27 sd 29 September 2016
WAKTU : 08.00 – 16.00
TEMPAT : Hotel Grand Aston Yogyakarta
Facilities
1.Convinience Meeting room
2.Souvenir
3.Certified Centra Gama Indovisi
4.Transportation during training
5.2x coffee break and lunch during training
6.Training kit
Registration Contact
Moh. Rozi
Phone : 0822-2664-6132
E-Mail : rozi@centragama.com
Pin BB: 7C98550B
Tagged on: Alignment Pump and Motor Pelatihan Alignment Pump and Motor Training Alignment Pump and Motor
Centragama Training & Consultant September 19, 2016 Mechanical, Technicial No Comments
? Corrosion Management
Motor Drives, Automation System & Motor Inverter System ?
Jadwal Pelatihan bandung-training.com tahun 2021:
Batch 1 : 24 – 26 Januari 2023
Batch 2 : 20 – 23 Maret 2023
Batch 3 : 15 – 17 Mei 2023
Batch 4 : 17 – 19 Juli 2023
Batch 5 : 25 – 27 September 2023
Batch 6 : 7 – 9 November 2023
Catatan : Jadwal tersebut dapat disesuaikan dengan kebutuhan calon peserta
Lokasi Pelatihan di Bandung :
- Yogyakarta, Hotel Dafam Malioboro
- Jakarta, Hotel Amaris Tendean
- Bandung, Hotel Golden Flower
- Bali, Hotel Ibis Kuta
- Surabaya, Hotel Amaris(6.00.000 IDR / participant)
- Lombok, Hotel Jayakarta
Investasi Pelatihan tahun 2019 ini :
- Investasi pelatihan selama tiga hari tersebut menyesuaikan dengan jumlah peserta (on call). *Please feel free to contact us.
- Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.
Fasilitas Training di Bandung :
- FREE Airport pickup service (Gratis Antar jemput Hotel/Bandara/Stasiun/Terminal)
- FREE Akomodasi Peserta ke tempat pelatihan .
- Module / Handout
- FREE Flashdisk
- Sertifikat
- FREE Bag or bagpackers (Tas Training)
- Training Kit (Dokumentasi photo, Blocknote, ATK, etc)
- 2xCoffe Break & 1 Lunch, Dinner
- FREE Souvenir Exclusive
- Training room full AC and Multimedia